Project case studies
Our own photographs from real installations. We only state what we can confirm, and we label work-in-progress images as installation stage.

Kings Gym · Chessington
VertexAir installed eight air conditioning units at Kings Gym Chessington. This project gallery brings together the finished reception area, indoor ceiling cassettes and outdoor equipment, alongside photographs taken during the installation.
Read case study
Kings Gym · Croydon
Five air conditioning units installed inside the main gym at Kings Gym Croydon. The photographs show the ceiling cassettes on the training floor and the outdoor units mounted on the building exterior.
Read case study
Installation stageKings Gym · Crawley
A sauna installed at Kings Gym Crawley. These photographs were taken during construction and show the timber structure being built in place, not the finished room.
Read case studyTell us about the space and we will arrange a site survey.